DISCOVERY REPORT / NORTHLINE CONCEPT
A clear case.
Before a build.
Start with the people, the handoffs and the work that keeps coming back.
CURRENT STATE / EXAMPLE
The same details, twice.
- TRIGGER / WEBSITE INQUIRYOwner reads the message.
- DUPLICATE ENTRY / OWNERContact details are copied into a spreadsheet.
- HANDOFF / OPERATIONSRequest waits for the person assigning the work.
- FOLLOW-UP / OWNERA reply is drafted from the original email.
Before proposing a tool: confirm who assigns the request and what information they need.
PROPOSED STATE / TO VALIDATE
One record. One clear owner.
- TRIGGER / COMPLETE INQUIRYCapture agreed fields once.
- PROCESS FIX / NAMED OWNERRoute the record to the responsible person.
- REVIEW / MISSING INFORMATIONFlag incomplete requests for a person to resolve.
- APPROVAL / CUSTOMER RESPONSEPrepare a reply for review before sending.
The human approval point remains. No live automation is represented in this sample.
BASELINE / ASSUMPTIONS TO CONFIRM
The numbers, with their limits visible.
| Input | Illustration | Validation needed |
|---|---|---|
| Total team effort | 5 hours / week | Time representative work with the operator |
| Working weeks | 48 / year | Confirm the actual operating calendar |
| Labor cost | $35 / hour | Client confirms the cost basis |
| Net time reduction | 30–60% | Measure review, exceptions and rework in a pilot |
240 hANNUAL BASELINE
72–144 hPOTENTIAL CAPACITY RECOVERED
$2,520–5,040CAPACITY VALUE / BEFORE ALL COSTS
Illustrative arithmetic, not a client result or cash-savings promise. Subtract the audit fee, implementation, software, maintenance and residual review costs before comparing options. An audit may recommend a process fix without a build.
PRIORITIZED ROADMAP
Fix the foundation. Then test the smallest build.
01 / Agree ownership and required fieldsProcess change first. One owner accepts or redirects each complete request.
Foundation02 / Pilot one intake pathTest with representative requests; compare time, completeness and exception handling.
Measured pilot03 / Expand only if the evidence supports itTrain the operator, document the fallback and agree any support scope.
Review gate